{"id":823,"date":"2024-10-31T05:37:00","date_gmt":"2024-10-31T01:37:00","guid":{"rendered":"https:\/\/www.utilitybusinessmena.com\/?p=823"},"modified":"2024-10-31T05:37:00","modified_gmt":"2024-10-31T01:37:00","slug":"engie-edf-renewables-and-jinko-power-in-race-for-1-5gw-khazan-solar-pv-mega-project-in-abu-dhabi","status":"publish","type":"post","link":"https:\/\/cheeltech.com\/utilitybusinessmena\/news\/engie-edf-renewables-and-jinko-power-in-race-for-1-5gw-khazan-solar-pv-mega-project-in-abu-dhabi","title":{"rendered":"ENGIE, EDF Renewables, and Jinko Power in race for 1.5GW Khazan solar PV mega-project in Abu Dhabi"},"content":{"rendered":"\n<p><a href=\"https:\/\/www.utilitybusinessmena.com\/renewable-energy\/emirates-water-and-electricity-company-ewec-invites-bids-for-1-5gw-zarraf-solar-project\" data-type=\"post\" data-id=\"419\" rel=\"nofollow noopener\" target=\"_blank\">EWEC (Emirates Water and Electricity Company)<\/a>, a leading company in the integrated planning, purchasing, supply, and system despatch services of water and electricity across the UAE, today announced the receipt of three proposals from ENGIE, a consortium comprised of EDF Renewables and Korea Western Power (KOWEPO), and a consortium comprised of Jinko Power and JERA, for the development of the new 1,500 megawatt (AC) <a href=\"https:\/\/www.utilitybusinessmena.com\/solar\/jinkosolar-and-acwa-power-sign-3gw-module-supply-deal-for-saudi-solar-projects\" data-type=\"post\" data-id=\"596\" rel=\"nofollow noopener\" target=\"_blank\">Khazna Solar Photovoltaic (PV)<\/a> Independent Power Project.<\/p>\n\n\n\n<p>Located in Al Khazna area of Abu Dhabi, Khazna Solar PV is EWEC\u2019s fourth world-leading, utility-scale solar power project. Once commercially operational, it will generate enough electricity to power approximately 160,000 homes across the UAE and will also raise EWEC\u2019s total solar PV power capacity to approximately 5.5 gigawatts (GW) AC. <\/p>\n\n\n\n<p>Khazna Solar PV is expected to reduce Abu Dhabi\u2019s carbon emissions by more than 2.4 million metric tonnes per year, providing 5 per cent of EWEC\u2019s forecasted 36 per cent reduction in power emissions intensity by 2030 compared to today.<\/p>\n\n\n\n<p>The Khazna Solar PV project plays a pivotal role in enabling EWEC to achieve its strategic plans of raising Abu Dhabi\u2019s solar power generation capacity to approximately 13 GW by 2030 and supplying 60 per cent of Abu Dhabi\u2019s total power demand from renewable and clean energy sources by 2035, in line with the Department of Energy\u2019s (DoE) Clean Energy Strategic Target 2035 for Electricity Production in Abu Dhabi.<\/p>\n\n\n\n<p>Othman Al Ali, Chief Executive Officer of EWEC, said: \u201cEWEC is commissioning and deploying globally recognised renewable and clean energy projects that secure a sustainable and reliable power supply for the UAE. Our latest project, Khazna Solar PV, is our fourth world-leading utility-scale solar project and a cornerstone in our strategic commitment to the UAE&#8217;s Net Zero by 2050 Strategic Initiative. Solar PV is pivotal in driving the energy sector transition to a carbon-neutral future, and collectively Khazna Solar PV, together with Noor Abu Dhabi, Al Dhafra Solar PV and Al Ajban Solar PV, will reduce carbon emissions by more than 8.2 million metric tonnes per year by 2027. We look forward to collaborating with the awarded partner to further strengthen the UAE\u2019s position as a global leader in sustainable development and decarbonisation initiatives.\u201d<\/p>\n\n\n\n<p>EWEC received 27 Expressions of Interest from potential bidding companies and consortiums, with 19 qualifying for the RFP stage after submitting Statements of Qualification. Moving forward, the proposals will undergo a detailed technical and commercial evaluation process to select the best proposal. The awarding announcement and the execution of the Power Purchase Agreement are expected to take place by Q2 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Khazna Solar PV plant will generate 1,500 megawatts of electricity, making it the fourth world-leading, utility-scale solar power project located in Abu Dhabi<\/p>\n","protected":false},"author":2,"featured_media":47,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,428,41,559,539],"tags":[938,939,811,205,92,206,940,941,942,943,944,945],"class_list":{"0":"post-823","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-news","8":"category-power","9":"category-renewable-energy","10":"category-solar","11":"category-sustainability","12":"tag-abu-dhabi-net-zero-2050","13":"tag-abu-dhabi-solar-project","14":"tag-carbon-emissions-reduction","15":"tag-edf-renewables","16":"tag-engie","17":"tag-ewec","18":"tag-jinko-power","19":"tag-khazna-solar-pv","20":"tag-renewable-energy-target","21":"tag-solar-power-capacity","22":"tag-uae-clean-energy","23":"tag-utility-scale-solar"},"_links":{"self":[{"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/posts\/823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/comments?post=823"}],"version-history":[{"count":0,"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/posts\/823\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/media\/47"}],"wp:attachment":[{"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/media?parent=823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/categories?post=823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cheeltech.com\/utilitybusinessmena\/wp-json\/wp\/v2\/tags?post=823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}