
Author: baset_asaba
Yellow Door Energy aims enhance its solar leasing capacity, offering long-term, cost-effective solar power solutions to businesses under Power Purchase Agreements (PPAs)
The bids for the pumping stations ranged from $23M to $67M, with companies allowed to bid on either or both pumping stations within the project scope
The wind farm, which will also include a 600 MWh Battery Energy Storage System (BESS), is expected to power around 300,000 homes
Hyundai E&C will build a 369-kilometer section of the Riyadh-Kudmi 500kV ultra-high voltage direct current (HVDC) transmission line
Egypt’s Ministry of Electricity and Renewable Energy has set pricing for solar energy generated and stored in battery systems
The platform is expected to enable scalability, transparency, and increased liquidity in carbon markets, meeting the needs of institutional buyers and sellers alike
The contract covers the upgrade of key systems, including the steam boilers, thermal unit control systems, and auxiliary equipment, with the goal of enhancing efficiency and reliability
The energy generated will supply Casablanca, Morocco’s largest city, via an extensive 1,400-kilometer electricity transmission network
The EOI submission window closes on November 19, inviting firms to participate in the competitive bidding process
The plant will have a production capacity of 250 megawatts (MW) and a storage capacity of 1,500 megawatt-hours (MWh)
Links
- News
- Electricity
- Water
- Renewable
- Features
Subscribe to Updates
Get the latest creative news from FooBar about art, design and business.
