
Author: baset_asaba
The latest phase of the solar park, which covers 20 square kilometers, is being executed under the Independent Power Producer (IPP) model, a collaboration between DEWA and Masdar through their joint venture, Shuaa Energy 4.
LONGi aims to deliver between 2 and 2.5 gigawatts of solar cell capacity under contracts with prominent international firms
The collaboration aligns with Masdar’s strategy to achieve a renewable energy portfolio of 100 GW by 2030 while advancing its ambitions in green hydrogen production.
Once operational in Q3 2026, Al Ajban is expected to generate enough electricity to power 160,000 homes and reduce carbon dioxide emissions by over 2.4 million tons annually.
The agreements include a 5 GW floating solar power project on Lake Nasser and a 2.8 GW solar project in Nagaa Hammadi
The project introduces a mobile platform designed to capture up to 0.25 tonnes of CO2 per day, providing a practical model for future carbon capture applications in the power generation sector.
For this project, Sineng will provide its advanced 8.8MW MV turnkey stations, each comprising 2 units of 4.4MW central inverter, a transformer, and an RMU.
Once commissioned, the BESS installations will enhance the country’s energy security by stabilizing the electrical grid and supporting a reliable power supply.
The project will link the PP14 power plant in Riyadh to the coastal region of Kudmi in southwestern Saudi Arabia.
The project will cover an area of 420,000 square meters and is designed to reduce the carbon footprint of the energy-intensive cement industry while supporting Saudi Arabia’s Vision 2030 renewable energy objectives.
Links
- News
- Electricity
- Water
- Renewable
- Features
Subscribe to Updates
Get the latest creative news from FooBar about art, design and business.
